0401 749 909
ScopePlantSites MethodQuestionsEnquiry Call 0401 749 909

Job sheet · Melbourne and Victoria wide

Tell us the access.
We will tell you the job.

On an excavation the square metres are the easy part. What sets the price is the gate you have to get through, how deep it goes and where the spoil ends up. Dirtcon start there.

Operating from
Smiths Gully, Victoria
Working across
Melbourne and Victoria wide
Smallest machine
1.7 tonne, fits a standard side gate
Largest machine
5 tonne excavator
Reply time
Inside 24 hours, Dirtcon’s own published promise
Quote
Free, no obligation

01 Scope

What Dirtcon are actually for.

01

Basement retention packages

Engineered excavation support for a basement, so the ground around the dig stays where it is and the structure goes in safely. Commercial and residential.

02

On site crushing

Concrete, brick and rock crushed and reused on the site it came from. Less carted away, fewer truck movements, and material you have already paid for stays on the job.

03

Tight access excavation

Compact machines for the jobs a standard excavator cannot reach. Side of a house, through a carport, behind a fence line.

04

Bulk excavation

Large volume digs for subdivisions, commercial developments, industrial sites and civil works.

05

Arena and site preparation

Grading, compaction and drainage for equestrian arenas, sports fields, hardstand, shed pads and level building platforms.

Also on the books. Site cuts, Trenching, Retaining walls, Bored piers, Demolition.

02 Plant

The gate decides the machine.

MachineWhat it is for
5 tonne excavatorThe workhorse for site cuts and bulk digs
2.5 tonne excavatorEnough reach for a driveway, small enough for a gate
1.7 tonne excavatorFits through a standard side gate
Posi tracks and skid steersLevelling, spreading and moving material on site
TippersSpoil off site without waiting on a third party
Crushing attachmentsConcrete and rock processed where it sits

03 Sites

Eight plates from real jobs.

Each plate is described by what is in the frame. No job on this page is presented as a named client project, because none is published as one.

Plate 01 Shotcrete walls, soldier piles and timber lagging holding the ground back while the basement goes in.
Basement retentionShotcrete walls, soldier piles and timber lagging holding the ground back while the basement goes in.
Plate 02 A machine working roughly a metre off the wall of a house, on rock, with the garden still standing.
Tight accessA machine working roughly a metre off the wall of a house, on rock, with the garden still standing.
Plate 03 A deep cut through orange clay with a mature tree left in place rather than taken out.
Bulk excavationA deep cut through orange clay with a mature tree left in place rather than taken out.
Plate 04 A Dirtcon machine breaking down a structure and sorting the material as it goes.
DemolitionA Dirtcon machine breaking down a structure and sorting the material as it goes.
Plate 05 Excavation under high voltage transmission lines, where the exclusion zone sets the method.
Civil worksExcavation under high voltage transmission lines, where the exclusion zone sets the method.
Plate 06 Spoil going straight into the truck, which is what keeps a small site moving.
Load outSpoil going straight into the truck, which is what keeps a small site moving.
Plate 07 A finished estate from the air, roads and levels in, ready for the builders.
Site preparationA finished estate from the air, roads and levels in, ready for the builders.
Plate 08 Rock placement and paving where the excavation has to end up looking like a garden.
Finished surfaceRock placement and paving where the excavation has to end up looking like a garden.
Recent sites

Balwyn NorthCanterburyDiamond CreekDoreenEltham

Taken from Dirtcon’s own posts. Deliberately not matched to the plates above, because those two sets cannot honestly be paired.

04 Method

From a photo on your phone to a machine on site.

  1. 1

    You describe the site

    Where it is, what the access looks like and roughly what has to come out. A photo from your phone usually says more than a paragraph.

  2. 2

    Jimmy works out the real problem

    Access, depth, ground conditions and where the spoil goes. That is what actually sets the job, not the square metres.

  3. 3

    You get a real figure

    A free quote with no obligation. Dirtcon publish a reply inside 24 hours of an enquiry.

  4. 4

    Nothing moves until you say so

    The dates get set with you, and the machine that turns up is the one the job needs.

How a site is run

Site specific SWMS
A safe work method statement written for the job, not a template carried between sites.
Daily pre starts
Machines and site checked at the start of every day before anything moves.
EPA Victoria practice
Erosion control, sediment management and waste kept to what the site actually needs.
WorkSafe Victoria and AS or NZS
Work carried out to the Australian standards that apply to the job.

05 Questions

Answered straight.

What does a job cost?

Dirtcon do not publish prices, and a page that guesses at one is no use to you. Access, depth, ground conditions and where the spoil goes are what set the number. Send a few details and you get a real figure.

Can you get into a tight backyard?

Usually yes. The fleet runs down to a 1.7 tonne excavator, which fits through a standard side gate, and tight access is one of the five things Dirtcon actually specialise in.

Which suburbs do you work in?

Melbourne and Victoria wide, run out of Smiths Gully in the Nillumbik shire. Recent work has been at Balwyn North, Canterbury, Diamond Creek, Doreen and Eltham.

What happens to the material you dig out?

Where it makes sense it does not leave. Concrete, brick and rock get crushed on site and reused, which cuts truck movements and keeps material you have already paid for on the job.

How quickly do you reply?

Dirtcon publish a reply within 24 hours of an enquiry. Start dates depend on what is already booked, so it is worth asking early.

Are you insured and what certificates do you hold?

Ask Jimmy and the current documents get sent through. Nothing about insurance or certification is stated on this page, because a certificate is worth more to you than a claim.

Deliberately left blank

No price, no rating, no review, no certification number and no single years figure appears on this page. Not one of them is published anywhere Dirtcon can be checked, and a concept that invents them would be selling you something you could not verify. Each one is a real decision waiting on Jimmy.

06 Enquiry

Six lines and Jimmy can price it.

Dirtcon

This is a concept, so nothing is sent anywhere. On the live site it goes straight to Jimmy.

About this concept. This is a design concept for Dirtcon, not a live website. The enquiry form, the hero questions and the chat are demonstrations and are not connected to anything. The panel headed Deliberately left blank lists exactly what has been left out and why. The business name, logo, phone number, email address, service list, plant list and photographs are real and were taken from Dirtcon’s own published material. Nothing on this page sends anywhere.